Kitchen floor change in Murcia
An open kitchen can have different levels of surfaces that need to meet. Check the final dimensions with the chosen preparation and finish, not just with the thickness of a sample. This information allows the joint edge to be studied before closing materials, preventing the continuous appearance of a reference from being treated as an applicable solution without checking the real support of both areas.
Tell us about your kitchen
Choose the type of renovation and the approximate size. Then write to us or fill out the form.
What we check before laying the pavement
- Existing baseCondition of the support and adherence of the current pavement.
- WithdrawalRaised from the ground if the project requires it.
- LevellingPreparation of the surface for the new finish.
- HeightsCompatibility with doors, plinths and appliances.
- PlacementInstallation of the flooring chosen according to its conditions.
- JointsTrims on skirting boards, thresholds and furniture.
Kitchen floor replacement quote in Murcia
Check the doors that cross the joint
The new height may affect the turning of a leaf or the passage that must be kept between stays. Consult jobs without general work to relate conservation and necessary adjustments. The proposal must identify which parts are adapted and which conditions are still pending, separating these works from the laying of the pavement to know the complete transition that will be installed in the house.
Define the perimeter with its finishes
Zocals, footwork and work limits need a planned solution. On the quote page you can order those operations next to the areas that remain. The assessment should show preparation and completion of the edge to compare equivalent ranges, keeping clear the hidden areas whose condition could modify the work before choosing the final distribution of the kitchen floor that will be renovated in the house.
Quote and scope of work at Murcia
An open kitchen may have a difference in height with the living room. We define the transition edge and the door adjustments required, before closing the flooring materials.






